Jump to content
  • Sign up for FREE! Become a GM-Trucks.com Member Today!

    In 20 seconds you can become part of the worlds largest and oldest community discussing General Motors, Chevrolet and GMC branded pickups, crossovers, and SUVs. From buying research to owner support, join 1.5 MILLION GM Truck Enthusiasts every month who use GM-Trucks.com as a daily part of their ownership experience. 

Rozz522

Inventory and ordering lead times

Recommended Posts

My order went to 3000 with a targeted production week of 3/22.

Share this post


Link to post
Share on other sites

Another update. 

Order completed with dealer 22 Dec.  They told me they wouldn't have allocation for my order until week of 11 Jan.

I went to status 3000 accepted by production control week of 22 Jan

Status 3300 with TPW of 22 Feb week of 1 Feb

It was status 3400 broadcast to production by Mon the 22nd and is 3800 produced today.  Was told waiting for inspection and no ship estimate as of yet.

 

Gas, CC, 2500, SLT

Share this post


Link to post
Share on other sites

Sold my 2006 Sierra VortecMax in the fall, been trying to figure out what would be a suitable replacement.

With every half ton now standard with cylinder shutoff, electric power steering, and other doodads I wanted no part of.. I pulled the trigger on a new 2500hd Chevy Silverado. It’s a 6,6 gasser WT with the Alaskan package and I ordered it with all the power/convenience packages, aux battery, few other things.

 

im I’m Thunder Bay , Ontario Canada. I ordered the truck on January 21 21, and it’s set for a build date of March 8, will be completed 6-8 weeks after that date.

 

will be worth the wait, I feel it’s a happy medium truck in the 3/4 ton truck segment.

Share this post


Link to post
Share on other sites

GMC Sierra 3500HD, Duramax, AT4 Crew Cab, Single Rear Wheel, Standard bed

 

2/15/21 - 1100; order placed

2/20/21 - 2000; GM accepted / order review

2/25/21 - 3300; TPW 3/29/21

 

Edited by cdh7917

Share this post


Link to post
Share on other sites

Chatted with my dealer today, and they finally just got two allocations for AT4 HD's.  Both are were spoken for, for factory orders (mine being one of them).

 

Only snag, which others have touched on, is the high clearance step - which are back ordered, with no estimate on when they will be getting more.  I had two options, keep the truck spec'd as is, but swap out the high clearance steps for the power folding steps, OR remove the premium plus package in which the high clearance steps are a part of, then re-build the truck to have all the options from the package piece by piece.

 

End of the day, I decided to just opt for the power steps.  I've already been waiting close to a month just for an allocation, I figured screw it... and went for the 'upgraded' steps.

 

Only other fly in the ointment, is the computer chip shortage that seems to be plaguing not just vehicle manufactures, but anything else that requires these chips.  Although they did say that if they do not have the chips at the time when they get to building the truck (and whatever else is on the line) they will complete the build, then install said chip(s) once they get them.  

 

Fingers crossed it will only be another 6 weeks till I get to see her! 

Share this post


Link to post
Share on other sites

I orderd mine on Jan 30th. 3500AT4 PBM gasser. Just got update that the build date is 3/18. How are you guys getting the codes to know where you are in the system? From dealer?

Share this post


Link to post
Share on other sites
6 hours ago, GMC4Zee said:

I orderd mine on Jan 30th. 3500AT4 PBM gasser. Just got update that the build date is 3/18. How are you guys getting the codes to know where you are in the system? From dealer?

The dealer and you can ask GMC chat. 

Share this post


Link to post
Share on other sites
On 2/24/2021 at 1:54 PM, Wxman said:

Another update. 

Order completed with dealer 22 Dec.  They told me they wouldn't have allocation for my order until week of 11 Jan.

I went to status 3000 accepted by production control week of 22 Jan

Status 3300 with TPW of 22 Feb week of 1 Feb

It was status 3400 broadcast to production by Mon the 22nd and is 3800 produced today.  Was told waiting for inspection and no ship estimate as of yet.

 

Gas, CC, 2500, SLT

Dealer is expecting delivery this Wednesday, 3 Mar.  Must help to be within truck distance and not need rail.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.