Had ordered a AT4 with duramax and 20" wheels with most of the packages as options ordered since January. Had this same truck with a 6.2L since the beginning of November on order and never had anything happen with that, so I switched to the duramax. Finally said today my build date is scheduled the 1st week in March. Hopefully this holds true, who knows from then how long it will take to actually get the truck?
Just chatted with gmc on my truck order that was put in originally in November with the AT4 package and all the other packages, and the 6.2L. This was taking forever so I switched the motor to the duramax in January. They just told me today my build is scheduled the first week in March. I hope this holds true.
I ordered a white AT4 back in October with a 6.2. Never did get a build date yet. I switched it to a 3.0 diesel AT4 now, maybe quicker with this motor? I think its the AT4 package though that might be the issue. I guess I will keep packing miles on my trade in so that value keeps going down, and missing out on incentives from GM and from my GM credit card.
On month 3 since I put my order in on a AT4 standard bed with a 6.2 and it is still has constraints on it. Order is accepted but no idea when it might get built.
Just chatted the other day with gmc and they said my order was accepted but no more information. Ordered a AT4 6.2L with a standard box and other goodies. Put the order in about 4 weeks ago.
Talked with my dealer the other day about the AT4 I ordered 3 weeks ago. They said still in PENDING. 6.2L, standard box, crew cab, white color, most all the other packages. Did you have something from the dealer that GMC chat found out about it for you?
Yes they said constraint on my AT4. So my chances of getting one are slim. I had a 6.2L with a standard box, and every other option, not the short useless box everyone else likes.
Last week ordered a 2021 Sierra AT4. Dealer said they were on hold for that model. They put the order in but had no idea when it would be built. Anyone else hear of this?