Time to delivery from TPW?


Recommended Posts

Posted

My truck has an assigned TPW of 12/28. I am assuming that production is completed during that week?

 

What is a fair estimate for time to dealership once next week has passed?

Posted

My truck has an assigned TPW of 12/28. I am assuming that production is completed during that week?

 

What is a fair estimate for time to dealership once next week has passed?

You are not giving us anything to work with.

 

What configuration is the truck?

 

What is your location?

 

A Mexico truck going to Canada is going to take a while, A Fort Wayne truck going to Indy is going to be very quick!

 

I have a MI truck that I was driving 3 days after it rolled down the assembly line...

Posted

Ah, fair enough!

It's a CCSB LT Z71 (Order form shows the model number as CK15543). I'm located in Tallahassee Florida.

Posted

Well you are looking at Mexico to Florida and on the slow train at that (will sit at the railway yards forever), I place my bet at taking delivery on...

 

 

1/27/16

Posted

The order for my 2015 Sierra Denali was put in the system the first week of June.

 

A week later it had a TPW of 6/22.

 

A few days later that was revised to 6/29.

 

I received an e-mail from my dealer on 6/26 stating it was built, with a tentative delivery date of 7/10.

 

Truck was received by the dealer on 7/15.

 

My truck was built in Mexico and I took delivery in Michigan.

 

Maybe I got lucky in that it was just over 30 days from the dealer placing my custom order to receiving the truck.

Posted

You are not giving us anything to work with.

 

What configuration is the truck?

 

What is your location?

 

A Mexico truck going to Canada is going to take a while, A Fort Wayne truck going to Indy is going to be very quick!

 

I have a MI truck that I was driving 3 days after it rolled down the assembly line...

 

Yep, my 2012 2500HD was built in Flint. My dealer was 80 miles away in Clinton Township. I was driving it just days after it rolled off the assembly line.

Posted

TPW = Target production week

 

Date can slip.

 

GM Production Codes
1000 Order On Hold at Dealership
1100 Order Placed at Dealership
1101 Order Entered into System
1102 Order Entered via Web
2000 Order Accepted by GM
2001 Order Generated to Dealer
2005 Order Replaced with GM Prospec Order
2030 Order Edited by GM
2500 Order Preferenced, Sent to Production
3000 Order Accepted by Production Control
3100 Order Available to Sequence
3300 Order Selected, Scheduled for Production by Assembly Plant *
3400 Order Broadcasted for Production, loaded on assembly plant computers
3800 Vehicle Produced, VIN is available
4000 Vehicle Available to Ship
4104 Bailment Invoice Created
4106 Bailment Released
4150 Vehicle Invoiced
4200 Vehicle Shipped
4300 Intermediate Delivery
4V03 Estimated Delivery Date
4B00 Bayed, vehicle is waiting on transportaion or pulled for quality control
4800 Rail Ramp Unload, vehicle at rr destination to await truck transport to dealer
5000 Vehicle Delivered to Dealer
6000 Vehicle Delivered to Customer
9000 Order Cancelled
* Target Production Week (TPW) is usually available by status code 3300.