6.2L Off Constraint


Recommended Posts

  • Replies 122
  • Created
  • Last Reply
Posted

Me too!!!

Awesome!! Was yours built the week of 5/23? My salesman told me they allocate 2 weeks for delivery from Mexico.

Posted

My TPW was 5/23. Still not produced. Wish I knew what the hold up was. 17 weeks and still counting.

Posted

Towerhog, what kind of build did you get? Aka options / layout. Ex. Mines a crew cab standard bed 6.2 4x4 blacKnow ltz..you tpw was June 13th but it just got pushed back to June 20th. It all has to do with what you ordered and what the production line is setup to build

Posted

My TPW was 5/23. Still not produced. Wish I knew what the hold up was. 17 weeks and still counting.

What order code are you at?

Posted

Its a simple build. Of course it will have the 6.2L. Deep ocean blue, double cab, standard bed, 4WD, LTZ, LTZ plus pkg, sport pkg, trailer brake controller, Nav, Heated/vented seats, AW floor mats, drivers side grab handle.

 

2 weeks ago it was at 3000.

Posted

MY TRUCK has a delivery date of 6/20 was ordered 1/20 was at dealer today ordering the borla exhaust for mine cant wait


my dads truck is a high country with the 6.2 also his was ordered same time as mine and is now going to be a 2017 model and in 2017 they offer black ash interior besides the saddle interior so he changed his to that color


Posted

Its a simple build. Of course it will have the 6.2L. Deep ocean blue, double cab, standard bed, 4WD, LTZ, LTZ plus pkg, sport pkg, trailer brake controller, Nav, Heated/vented seats, AW floor mats, drivers side grab handle.

 

2 weeks ago it was at 3000.

I know the double cabs get made at a different location than crew cabs. No idea what the hold up is.

Any idea what July's incentives are gonna be?

Posted

I was also told today by my dealer that the truck I ordered on April 25th won't be produced as a 16. I have to change the order to a 17. Supposedly gm isn't giving allocation for 6.2s in Texas anymore for 2016.

 

Sent from my SAMSUNG-SM-G920A using Tapatalk

Posted

Much better news this week. Truck has been built and shipped. Shows a 4300 code. So hopefully Ill have it in the next 2 weeks.

Posted

Anyone know how long from code 3400 til production? Does the 3400 happen the week prior to the build week? Aka broadcast on Thursday what the assembly line is to produce the following week.