6.2L Off Constraint


Recommended Posts

Posted

I just spoke to my dealer after checking with GM chat since my order has been at 1100 since April 14. The inventory manager said nothing about the constraint and that he did have allocation for the 6.2 but couldn't explain why it wasn't picked up for the past 3+ weeks. He did say though that it should be picked up this Thursday so hopefully he is correct but I'm not holding my breathe...

  • Replies 122
  • Created
  • Last Reply
Posted

Good news. Finally. Its been accepted by Production Control and has a TPW of 5/23. Hope they stay on schedule.

Posted

TPW 05/23/2016 is the exact time frame I am being told for my replacement 2016 Silverado that has been on order since 02/24/2016. How to you go about finding the different "codes" as far the build goes from start to finish?

Posted

I just spoke with gm and was told that my truck is still at 1100. The only thing holding it back is the 6.2. They said the 6.2 is back on constraint.

 

Sent from my SAMSUNG-SM-G920A using Tapatalk

Posted

1000 Order On Hold at Dealership
1100 Order Placed at Dealership; Preliminarily Accepted by GM Computer.
NOTE: Does NOT mean that GM is guaranteeing that the car will be produced -- as that only occurs at status code 2000!
1101 Order Entered into System
1102 Order Entered via Web
2000 Order Accepted by Chevrolet, "has passed approval and will be produced"
2001 Order Generated to Dealer
2005 Order Replaced with GM Prospec Order
2030 Order Edited by Chevrolet
2050 Order Changed
2500 Order Preferenced (or "Picked Up" or "Imaged"), Sent to Production
3000 Order Accepted by Production Control
3100 Order Available to Sequence (now becomes more stable)
3300 Order Selected and Scheduled for Production by Assembly Plant (Target Production Week usually available now)
3400 Order Broadcasted for Production (Internal Plant Order Produced)
3800 Vehicle Produced
4000 Vehicle Available to Ship
4104 Bailment Invoice Created
4B00 Bayed ("B", not 8: Your car is waiting for transportation by Truck, Rail or transfer to vendor)
4D00 12/2/13 On hold (Quality Control Checks)
4106 Bailment Released (vehicle has left plant property).
4150 Vehicle Invoiced (Dealer Billed/Order is invoiced to the dealer)
4200 Vehicle Shipped (Vehicle is shipped to the dealer or point of delivery)
4300 Intermediate Delivery (Interim transfer; processing transfer to QC or vendor)
4V03 Estimated Delivery Date
4800 Rail Ramp Unload
5000 Vehicle Delivered to Dealer
6000 Vehicle Delivered to Customer
9000 Order Cancelled

Posted

My 2016 GMC Sierra 1500 SLT, Crew Cab, Standard Box, 6.2l with NHT just went to code 3000. Moving along after officially placing the order on April 28th!

Posted

My 2016 GMC Sierra 1500 SLT, Crew Cab, Standard Box, 6.2l with NHT just went to code 3000. Moving along after officially placing the order on April 28th!

Congrats Outburst! Appears that your dealer had the allocation and the stars aligned to move you through the order process. I just checked with chat and I'm still at 1100. My dealer said that my order should get picked up Thursday but I think that was BS just to get me off the phone. At this point if I want a 2016 I'm just going to have to wait it out with this order until they tell me that GM isn't building anymore 2016's...

Posted

Congrats Outburst! Appears that your dealer had the allocation and the stars aligned to move you through the order process. I just checked with chat and I'm still at 1100. My dealer said that my order should get picked up Thursday but I think that was BS just to get me off the phone. At this point if I want a 2016 I'm just going to have to wait it out with this order until they tell me that GM isn't building anymore 2016's...

 

This is accurate and was given to me when I first ordered. Hope it helps others.

 

DOSP - Dealer Order Submission Process

 

The weekly process consists of 4 stages.

 

1. Constraints Distribution - Dealers are informed on constraints to review before placing orders. (A Constraint is a limit placed on specific build configurations.)

 

2. Dealer Order Submission - Dealers can order on Thursday, Friday or no later than midnight on Saturday. (You can submit orders earlier but you don't know the constraints.)

 

3. The 4-Pass Process - GM will attempt to place each dealer’s orders on Mondays using a 4-Pass process. (At this point a dealer may get more or less than was allocated, if they asked.)

 

4. Dealer Review - You can review your placed orders for changes or replacements until Tuesday at 9pm ET. That's when the orders are sent to production control.

 

Note - Orders will not move unless dealer has allocation.

Posted

Crossed paths with a higher up with GM today and he explained that they only produced 6 6.2 trucks last week... I asked all about it and he was very cryptic with his answers and I'm sure has to be tight lipped but did say the issue is not with the engine itself.

 

 

 

My best guess is that it has to do with CAFE numbers, but could be wrong. Either way a lot of us are stuck waiting....

Posted

The best way to break in the engine is to turn off AFM and drive it like you stole it.

 

 

How do you turn the AFM off? Thanks

  • 3 weeks later...
Posted

I'm on week 5. Still at 1100. Dealer did say that GM has extended the 2016 builds through September.

 

Sent from my SAMSUNG-SM-G920A using Tapatalk

Posted

3800 Vehicle Produced, VIN is available

 

4000 Vehicle Available to Ship

 

4104 Bailment Invoice Created

 

4106 Bailment Released

 

4150 Vehicle Invoiced

 

4200 Vehicle Shipped

 

4300 Intermediate Delivery

 

4V03 Estimated Delivery Date

 

4B00 Bayed, vehicle is waiting on transportaion or pulled for quality control

 

4800 Rail Ramp Unload, vehicle at rr destination to await truck transport to dealer

 

5000 Vehicle Delivered to Dealer

 

6000 Vehicle Delivered to Customer

 

9000 Order Cancelled

 

* Target Production Week (TPW) is usually available by status code 3300.

this is where I am now at with my 2016. looks like it will be a solid 4 months from the date that it was ordered. I am assuming that it is close to shipping since that it does have a vin number and chat.chevrolet.com can provide no further information. 16 weeks for a engine that advertised in every 1500 Silverado commercial on tv. makes no sense.