a7b797cbbbff9b5f4b9b0d43eccd3450.jpgd1fbd98b3846e7bf97cf6c30ddda6beb.jpgbe5f9c1300db3e084a2aef486342e2cc.jpg0451622da72e2ea25393ac7e745b5993.jpg

 

Framing is essentially complete! Installed all of the fireblocks last Friday, and we have started procuring the supplies to begin electrical rough in! We also did a test fit of the truck to make sure the passageway didn't take up too much room.

 

 

Sent to the Interwebs by a Phone Shaped Apple

  • Like 1
Link to comment
Share on other sites

  • 2 weeks later...

87da3f2006a733fa8cc1c11f5b76020d.jpg69e05d49734f8755c2a438c8b8e6b6c6.jpg5bbf87e654626f2bf2c07b4fcb02b447.jpg110d03943dc586b5a7a2df4b3076e106.jpgbdf3b7b4373b1dc6f8b406e48ebe6fd0.jpgaf693af12f0e7fad0e9e00c5761cb3ef.jpg

 

Electrical rough in is nearly complete! All that is left so far is the lights in the garage, and for an electrician to set the meter box, and the weatherhead, and then we will start the paperwork for DES to come and hook it up to the grid! I'm also considering burying an Ethernet cable from the house to get a proper Internet connection to it!

 

 

Sent to the Interwebs by a Phone Shaped Apple

  • Like 1
Link to comment
Share on other sites

2921a76d504cfa2d2e084c805dde5129.jpg0a25f7597d57c761c99c9fc8b6ddb7a1.jpg4385e6c5f43ce590a36ef9db6237d0d3.jpgceb2d955a0129c916a8bad36806fd5b4.jpg

 

Things in the gun room have taken on a pink and blue hue, due to insulation going up today! And there is already a marked difference in both sound and temperature!

 

 

Sent to the Interwebs by a Phone Shaped Apple

  • Like 1
Link to comment
Share on other sites

2b7b5b6a3dbf5eb7aea5a28312618ead.jpg79a58fa11cd8edc204bf10da514a382c.jpgeaac64d57b0474d579bdf79b151f7e50.jpga69148aa9c252ce8f0cb4458147611fc.jpg

 

Well, the Train Room is now taking on that same blue and pink insulated hue that the gun room is sporting! And as you can see above the timber walls, we have started insulating the exposed metal walls with styrofoam to prevent radiant heat from entering the room and making the future HVAC system from having to work harder and run up a huge electric bill.

 

 

Sent to the Interwebs by a Phone Shaped Apple

Link to comment
Share on other sites

  • 2 weeks later...

c58eb272f0400b6d3edbb90e93db6a3b.jpg4675a8399756a43253dec897bf5f07c9.jpg808763e9efc8701ee3434858a458185d.jpg62391657f03b2cb74d51c75dc258321f.jpg

 

Well the Train Room is Ready for Drywall! Also, the passageway has been covered on the garage side with the metal that was cut out (and a bit more beside) to make the passageway; still waiting for an electrician to inspect the load center, and to set the meter box, weatherhead, and ground rod. Then we are going to rent some scaffolding to insulate the roof of the garage and finish running the Ethernet cable for the data connection in the Gun room. Then after that, we will start building the ductwork for the HVAC system.

 

 

Sent to the Interwebs by a Phone Shaped Apple

  • Like 1
Link to comment
Share on other sites

36195a25188faaa000181618e250ac82.jpg59ca85e662c58e038e464b5975d8b205.jpg

 

Well, we are one step closer to having electricity flowing into the shop! Had to call around because a lot of the electricians around town are booked up solid for the next month! Managed to find a couple of local guys cheap; all that is left is the state inspection, and for DES to hook us up!

 

 

Sent from my iPhone using Tapatalk

  • Like 1
Link to comment
Share on other sites

4b1d40c18246be96f7c5a3f7328a7683.jpg

43adf1e82fe2d72664ce96d6ccf68f2d.jpg

 

WE PASSED INSPECTION!!! Our shop is ANOTHER step closer to having the Spark (Literally!!) of Life flowing through it!!

 

 

Sent from my iPhone using Tapatalk

Edited by 09LowesSilverado
  • Like 1
Link to comment
Share on other sites

921cf3633b5fe2ba453abbedcdce985e.jpg70fdfadc7f5a8dd20b116b7189099d57.jpga67b62883662dd79d4e0b76c59ac6637.jpgb9ed3ca7858221bc3984af0db8485f0d.jpgd4d54e47d3ff2ae43c6eeaf1252b84aa.jpg

 

Well, the drywall hanging has commenced, as well as the first bits of ductwork for the HVAC system have been installed! And as of this post, the Train Room has ALL of its drywall up! And now for the bad news; Dickson Electric got a little butt hurt that we didn't call them right away for a checklist of things for us to do to make them happy about our meter box (they wanted it in a spot that would have looked ugly, as well as they wanted our weatherhead over 40 feet off the ground) so now they want to charge us $800 to put a stub pole in so they can run a power line to another pole without a transformer (and I get the feeling they are going to charge us for the transformer) even though there is a pole WITH a transformer about 90 feet diagonally from the weatherhead!

 

 

Sent from my iPhone using Tapatalk

Edited by 09LowesSilverado
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.